BREEAM ES Vivienda V6 · new build

BREEAM Vivienda without a BMSVery Good with the data the manual asks for.

No BREEAM ES Vivienda requirement awards points for installing a building management system. What Very Good does require is measuring temperature and consumption in every home and showing them in real time in an app.

Living room of a Vila Bonaplata home, with a sofa, dining table and access to the balcony
What a BMS contributes in BREEAM Vivienda

The scoreboard, according to the manual

We have reviewed every requirement in the scheme. The building management system (BMS) appears twice, and neither earns points.

0 points

In no requirement of the scheme and at no rating level.

At least €300 more per home

That's the extra cost of a BMS in the shared areas of a development, compared with metering them without one.

1 technology minimum

SYB 12 Smart homes. Required from Very Good, and it does not ask for a BMS.

The proof

What the manual says, word for word

GST 04, criterion 2 and note NA06

No requirement scores it

The BMS appears as something to be commissioned if specified, and as an example of a complex system. Not a single point is linked to installing it.

GST 04, NA06 · GST 05, criterion 3

It adds commissioning work

If specified, GST 04 requires commissioning procedures specific to the BMS. In GST 05, a minimum at Excellent and Outstanding, it counts as a complex system and may require a Commissioning Specialist.

RITE, IT 1.2.4.3.5

The law doesn't require it either

The RITE (Spain's Regulation on Thermal Installations in Buildings) only requires automation and control systems in non-residential buildings over 290 kW. Of residential buildings it says they “may be equipped”.

Table 3 of the manual

The minimum requirements for each rating

What must be met no matter what at each rating, on top of reaching the minimum score. Of the fifteen minimums across the three ratings, only SYB 12 depends on technology; the other credits come from the design, the conventional installation or the documentation.

RequirementWhat it isVery Good
≥ 55 %
Excellent
≥ 70 %
Outstanding
≥ 85 %
What you need to install
GST 03Responsible construction practices—1 point2 pointsDocumentation and process
GST 04Home user guide (criterion 10)MandatoryMandatoryMandatoryDocumentation and process
GST 05Periodic commissioning—1 point1 pointDocumentation and process
SYB 01High-frequency ballasts (criterion 1)MandatoryMandatoryMandatoryConventional installation
SYB 06Inclusive and accessible design——2 pointsProject design
SYB 08Recreational space—1 point1 pointProject design
SYB 09Water contamination risk1 point1 point1 pointConventional installation
SYB 11Security——1 pointProject design
SYB 12Smart homes1 point1 point1 pointSensors and an app or display
ENE 01Reduction of energy use and emissions—4 points6 pointsProject design
AG 01Water consumption1 point1 point2 pointsConventional installation
AG 04Irrigation demand—1 point1 pointConventional installation
MAT 03Legal timber (criterion 1)MandatoryMandatoryMandatoryDocumentation and process
RSD 01Construction and demolition waste——1 pointDocumentation and process
RSD 03Household waste—1 point1 pointProject design

“—”: not a minimum at that rating, although it can add points. BMS required at any rating: none. The ENE 01 points come from the project's energy model, not from a BMS.

The only technology minimum

SYB 12, criterion by criterion

It is a minimum from Very Good and sits entirely within the home. The point you need, the one for a basic smart home, requires these four criteria.

CriterionWhat it requiresDoes a conventional installation provide it?How Alfred Smart covers it
1 · TemperatureSensors that monitor the indoor temperature of the main rooms and the outdoor temperature.No. The thermostatic valve required by the RITE regulates the emitter, but it does not measure or record.A connected thermostat and temperature and humidity sensors in every home, plus an outdoor sensor.
2 · ConsumptionSensors that monitor electricity and fuel consumption, and water consumption.Partly. The meters exist, but they are billing meters or read periodically and do not give real-time data.An energy meter in the home and readings from the water meters and, if there is one, the heat meter.
3 · ConnectivityBroadband of over 24 Mb/s and 3G, 4G or 5G coverage indoors.Yes. The building provides it; it only needs to be documented.Nothing to install: it is documented on site with the network operators’ coverage maps.
4 · App or displayShow indoor and outdoor temperature and consumption in real time, and control the temperature remotely.No. It is the data layer.The Alfred Smart app for whoever lives in the home, with climate and consumption.

The 90 m² threshold

The main rooms are the living room, dining room and main bedroom (note NA07). Below 90 m², one sensor in the living room is enough; from 90 m² upwards, all three need one. A single thermostat per home does not meet criterion 1 in large layouts.

What the first point doesn't require

No history or downloadable reports (criterion 10a, third point), no CO₂, humidity or lighting (criteria 6 and 7, second point), and no storing 12 months of data (GST 05, which is not a minimum at Very Good). Note NA08 allows one app for temperature and another for consumption.

No BMS doesn't mean no platform

Criterion 4 requires an app or a display, so the data layer is essential at Very Good. What you don't need is the building management system. They are two different things and it is best not to mix them up at the project meeting.

When does a BMS make sense?

It depends on heat generation, not on the score

When there is centralised generation and shared areas with plant to manage, the BMS is justified by operations. What makes no sense is carrying one over when generation is individual, as it is in most residential buildings.

A boiler or heat pump in each home

Individual generation

Royal Decree 736/2020 on individual metering does not apply. The fuel consumption in criterion 2 comes from the home's gas meter; with a heat pump, it is all electricity consumption. There is no central plant to manage: a BMS adds no points.

Boiler room, central heat pump or district network

Centralised generation

Royal Decree 736/2020 requires every home to be metered with remote reading, and that data feeds criterion 2 of SYB 12. A BMS may be justified to run the central plant. If there is one, the Alfred platform gateway reads it via KNX, Modbus or BACnet: one app and one dashboard.

Three ways to collect the data, the same home

No BMS, meters inside

Only in the home

One gateway per home receives the data from the thermostat, sensors, energy meter and meters by radio. Nothing is installed in the shared areas.

No BMS, meters on the landing

Meters outside, via LoRa

The same inside the home, plus a LoRa transmitter on each meter and a LoRa gateway for the building. Readings arrive by radio, with no cabling.

With centralised generation

With the building's BMS

The BMS still runs the central plant, pumping and ventilation. The Alfred platform gateway reads its data and Metrics combines it with the data from the homes.

The same home in all threeThermostat, sensors, energy meter and gatewayOnly in thehomeMetersinside. Nothing inshared areasMetersoutside, via LoRaLoRa transmitter oneach meter andLoRa gatewayWith the BMSof the buildingThe BMS runsthe plant; thegateway reads it
Metrics and the app: the SYB 12 data, the same in all three
Only the way the shared-area data arrives changes. Without central plant, the first or second option is enough and no BMS is needed.

In all three, the home meets SYB 12 in the same way. Residents see it in the app; the building manager and the BREEAM assessor see consumption and comfort for the whole building in Metrics.

The document

The requirements map by rating

One sheet per rating with the Table 3 minimums, the evidence each requirement asks for at design and post-construction stage, and which part the project's conventional installation already covers. We send it to you by email.

  • Very Good, Excellent and Outstanding minimums, requirement by requirement and with the criterion required.
  • The SYB 12 evidence, criterion by criterion, at design and post-construction stage.
  • What changes above 90 m² and what the first point doesn't require.
  • Scenarios with and without centralised generation, and what really changes if a BMS is specified.
What is your role in the project?

Controller: Alfred Smart. Purpose: to handle your request. More information in the privacy policy.

Projects

More than 5,000 homes rated at least BREEAM Very Good

As a BREEAM partner, we have supported more than 5,000 homes rated at least BREEAM Very Good. Three of the developments:

Living room of a Vila Bonaplata home, with a sofa, dining table and access to the balconyBuild-to-Rent · Barcelona

Vila Bonaplata

68 homes rated BREEAM Very Good.

Rendering of the façade of the nine-storey Antares I building, with balconies and lights on in the homesResidential · Seville

Antares I · LAVIDDA

82 homes rated BREEAM Very Good.

Build-to-Rent · Barcelona

Glòries HUB

59 homes rated BREEAM Very Good.

Do you have a development in design?

For the developer's technical or sustainability team: we review the project with you and tell you which architecture fits it and what SYB 12 requires for your home types.

Review my development →
FAQ

What we are asked at the project meeting

Do you need a BMS for BREEAM Vivienda Very Good?

No. No BREEAM ES Vivienda V6 requirement awards points for installing one, and Table 3 does not require it at any rating. What is a minimum from Very Good is SYB 12: measuring temperature and consumption and showing them in an app or a display.

Is one thermostat per home enough?

Only in homes under 90 m², where note NA07 allows the temperature sensor in the living room only. From 90 m² upwards, sensors are needed in the living room, dining room and main bedroom, as well as the outdoor temperature.

Do you have to store 12 months of data?

Not at Very Good. Criterion 4 of SYB 12 asks for real time. The 12 months of data are in GST 05, which is only a minimum at Excellent and Outstanding, and there the required point is the one for periodic commissioning.

What if heat generation is centralised?

Royal Decree 736/2020 already requires every home to be metered with remote reading, so part of the metering is required by law anyway. If the building has a BMS to run the central plant, the Alfred platform gateway reads it via KNX, Modbus or BACnet, and the data from the homes and the plant end up in the same app.

Who decides the credits?

The project's BREEAM assessor, using the current manual, and BREEAM ES verifies them. Alfred Smart does not issue certifications: we provide the installation and the evidence each criterion asks for.

Are you a BREEAM assessor or an engineering firm?

We give you the SYB 12 evidence ready for your report, and the same data works for BREEAM In-Use and the EPBD.

For consultants and engineers →

References to the BREEAM ES Vivienda V6 Technical Manual, IPC-BREEAM-01-04-2020, edition 02 of 2 August 2024 (Table 3 and requirements GST 04, GST 05 and SYB 12), to the RITE (RD 1027/2007, amended by RD 178/2021) and to Royal Decree 736/2020. BREEAM® is a registered trademark of BRE. Do you have a development at design stage? Review it with our team.